Last reviewed: November 2026. This is planning information, not electrical advice. All electrical work should be designed and performed by a licensed electrician under your local code.
Electrical work is easy to underestimate on a walk-in project. Equipment prices usually do not include it, and a panel that turns out to be full can delay an opening. Here is what to plan for.
What uses power in a walk-in
- Condensing unit (compressor and condenser fan): the largest load
- Evaporator fans and, on freezers, defrost heaters
- Door frame and drain line heaters on freezers
- Interior lights, usually LED fixtures rated for cold, wet locations
- Controls and alarms
Read the nameplate and spec sheet
Every condensing unit and evaporator lists:
- Voltage and phase: for example 115V single phase, 208–230V single phase, or 208–230V or 460V three phase. The voltage and phase of your system come from its own nameplate and wiring diagram.
- MCA (minimum circuit ampacity): used to size the wire.
- MOP or MOCP (maximum overcurrent protection): the largest breaker or fuse allowed.
Send these spec sheets to your electrician before you order, not after delivery. If your building has three-phase power, ask whether a three-phase version of the system is available.
Things your electrician will want to check
- Is there space and capacity in the existing panel, or is an upgrade needed?
- The distance from the panel to the condensing unit and evaporator
- Dedicated circuits for the refrigeration equipment
- A disconnect within sight of the condensing unit (NEC 440.14 requires the disconnecting means to be within sight of and readily accessible from refrigerating equipment)
- Outdoor-rated wiring and fittings for rooftop or exterior units
- Wiring for lights, heaters and alarms inside the box
Budget and schedule tips
- Get the electrical quote at the same time as the equipment quote.
- Ask whether the electrical permit is included.
- Coordinate so circuits are ready before the refrigeration contractor arrives for start-up.
- Consider a temperature alarm with a phone notification, and ask whether your refrigeration should be on a circuit that a backup generator can serve.
Common mistakes
- Ordering a 208–230V or three-phase system for a building that only has 120/240V single phase
- Discovering a full electrical panel on installation day
- Sharing a refrigeration circuit with other kitchen equipment
- Forgetting power for the outdoor condensing unit location
See also How a Walk-In Cooler Is Installed, Step by Step and Evaporators and Condensing Units Explained.