Health Department Plan Review for a Walk-In Cooler

Last reviewed: November 2026. Requirements differ by state, county and city. Contact your local health department early.

Before you build or remodel a food business, most health departments require a plan review. The Food Code (§§8-201.11–8-201.12) calls for plans when an establishment is built or remodeled, or converted. Whether adding or replacing a walk-in counts as a remodel is up to your local health department, so ask before you order.

What you typically submit

  • A floor plan showing where the walk-in sits and how food moves from receiving to storage to prep
  • Equipment spec sheets for the walk-in and refrigeration, showing sanitation certification (usually NSF/ANSI 7)
  • Interior finishes for walls, ceilings and floors
  • Shelving details
  • Plumbing details for the condensate drain
  • Lighting details
  • The plan review fee

What reviewers check

ItemWhat they look for
CapacityEnough cold storage for the menu and delivery schedule
ConstructionSmooth, durable, easily cleanable surfaces
FloorsCleanable, non-absorbent; coving at the wall-floor joint
ShelvingFood stored at least 6 inches off the floor, cleanable materials
ThermometersAn accurate thermometer visible in the warmest part of the unit
LightingAdequate light, with shielded or shatter-resistant bulbs
DrainsCondensate drains connected indirectly to the plumbing, as required

Tips for a smooth review

  • Submit before you order the walk-in, not after it is installed
  • Use certified equipment and include the spec sheets. See Walk-In Certifications
  • Coordinate with the building department; you may need permits from both. See Do You Need a Permit?
  • Ask whether a pre-opening inspection is required after installation

Sources